證書:ISO9001 ISO14001 OHAS18001
材質:S275J0H/S275J2H/S355J0H/S355J2H/S450J0H/S450J2H
交貨期:7-30天
差異化服務:小批量訂單及加工,價格公道
熱浸鋅H型鋼 Hot-Dip Galvanized H-beam |
鋼鐵工程材料 Steel structure products |
熱浸鋅鋼管 Hot-Dip Galvanized Pipes |
熱浸鋅鋼板 Hot-Dip Galvanized Plate |
LED顯示屏鋼結構 LED display steel structure |
熱浸鋅角鐵 Hot-Dip Galvanized Angle steel |
天面工字鋼桁架 Roof steel truss Fabrication |
熱浸鋅槽鋼 Hot-Dip Galvanized Channels |
鋼結構支架安裝 Steel structure bracket Works |
熱浸鋅圓鋼 Hot-Dip Galvanized Round Bars |
蓮塘工程幕墻件 Liantang Curtain Wall Works |
重型工字鋼架 Heavy steel structure Fabrication |
Project P568 – Midfield Arup Development Works | FTJ-CHEC-ZHEC Joint Venture |
Contract no. 3206, Three Runway SystemProject.Main Reclamation Works | Airport Authority |
DC/2013/10 Design, Build and Operate San Wai Sewage Treatment Works – Phase 1 | ATAL CONSTRUCTION LIMITED |
Main Contract (Phase 2A works) – Proposed Chu Kong New Terminal Facilities, Tuen Mun Town Lot No.491, New Territory |
Concentric construction Ltd |
CV/2016/08 Queen’s Hill Development – Sewage Pumping Station Works | China Geo-Engineering Corporation |
HY/2014/08 Central Kowloon Route Yau Ma Tei East | BK-SK-JV |
Proposed Residential Developement at Inland Lot No. 8949 – 21,23&25 BORRETT ROAD, H K | CR Construction Company Limited |
SS C505 Construction ofLiantang/Heung Yuen Wai Boundary ControlPoint (BCP) – BCP buildings and associatedfacilities | 建築署(ASD) |
KL2014/01 Kai Tak Development-Stage2 InfrastructureWorks for Developments at Southern Part ofthe Former Runwayioning | 大陸工程–捷章建築聯營/CEC-CCC JV |
HY/2011/08 Construction of tunnel buildings, installation of route-wide electrical and mechanical works and TCSS, and associated works for tunnel commissioning. | Leighton Joint Venture |