證書: ISO9001 ISO14001 OHAS18001
材質: S275J0 S355J0 S355J2 S450J0 S450J2
交貨期: 7-30天
差異化服務: 小批量訂單及加工,價格公道
Project P568 – Midfield Arup Development Works | FTJ-CHEC-ZHEC Joint Venture |
Contract no. 3206, Three Runway SystemProject.Main Reclamation Works | Airport Authority |
DC/2013/10 Design, Build and Operate San Wai Sewage Treatment Works – Phase 1 | ATAL CONSTRUCTION LIMITED |
Main Contract (Phase 2A works) – Proposed Chu Kong New Terminal Facilities, Tuen Mun Town Lot No.491, New Territory |
Concentric construction Ltd |
CV/2016/08 Queen’s Hill Development – Sewage Pumping Station Works | China Geo-Engineering Corporation |
HY/2014/08 Central Kowloon Route Yau Ma Tei East | BK-SK-JV |
Proposed Residential Developement at Inland Lot No. 8949 – 21,23&25 BORRETT ROAD, H K | CR Construction Company Limited |
SS C505 Construction ofLiantang/Heung Yuen Wai Boundary ControlPoint (BCP) – BCP buildings and associatedfacilities | 建築署(ASD) |
KL2014/01 Kai Tak Development-Stage2 InfrastructureWorks for Developments at Southern Part ofthe Former Runwayioning | 大陸工程–捷章建築聯營/CEC-CCC JV |
HY/2011/08 Construction of tunnel buildings, installation of route-wide electrical and mechanical works and TCSS, and associated works for tunnel commissioning. | Leighton Joint Venture |
立即獲取免費報價!Get Your Free Quotation Today!
請致電任生:
Phone:+852-65561469
WhatsApp:+852-65561469
E-mail:king@ulsteel.com
谢小姐
Phone:+852-92991977
WhatsApp:+852-92991977
E-mail:hkhuangshangyou@ulsteel.com